Nonlinear FEM and Control Method for Super-Long Span Three Main Trusses and Three Cable Planes Railway Cable-Stayed Bridge

Article Preview

Abstract:

The Anqing Changjiang River Railway Bridge is an important fixed link across the Changjiang River in Anqing both the Nanjing-Anqing Intercity Railway and Fuyang-Jingdezhen Railway. Its main bridge is a six-span continuous steel truss girder cable-stayed bridge with main span of 580 m. The purpose of this paper is to describe some of its main features and FE model for geometrical nonlinearity using the finite element program ANSYS as well as control method of stress-free status for erection of cable-stayed bridge. Based on geometrical nonlinear analysis theories, secondary development of ANSYS using APDL was accomplished.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 255-260)

Pages:

1065-1069

Citation:

Online since:

May 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] M. Virlogeux: Engineering Structures . Vol. 21(1999), p.737–755.

Google Scholar

[2] Haizhu Xiao, Wei Xu, Zongyu Gao: Bridge Construction. Vol. 5(2009), p.6–8 (in Chinese).

Google Scholar

[3] P. -H. Wang : Computers and StructuresVol. 80 (2002), p.165–182.

Google Scholar

[4] Ernst HJ: Der Bauingenieur. Vol. 40(1965), p.52–5.

Google Scholar

[5] Fleming JF: Int J ComputStruct. Vol. 10(1979), p.621–35.

Google Scholar

[6] Gimsing NJ: JohnWiley and Sons Inc(1997).

Google Scholar

[7] PhWang, CgYang: Int J ComputStruct. 60(1996), p.243–60.

Google Scholar

[8] Shunquan Qin: Bridge Construction. Vol. 2(2003), p.31–36 (in Chinese).

Google Scholar

[9] Xiaohang Huang, Zongyu Gao: Bridge Construction. Vol. 1(2010), p.71–75 (in Chinese).

Google Scholar