Model Test for a New Chorded Arch Bridge

Article Preview

Abstract:

A new chorded arch bridge is put forward by Professor Zhixiang zhou of Chongqing Jiaotong University. For further exploration by the bridge design and construction scheme of the feasibility and rationality, and to verify the correctness of the theoretical analysis and probe the effective measures to deal with the closure error during in the rotating construction, a model made with by organic glass (ratio of the model to original bridge is 1/10) is has been experimented. In this test, the rotating down procedure of the construction was simulated and studied, possible closure errors were tested and corresponding measures are proposed, and the mechanical performances at key stages of construction and service were examined. Plentiful experimental data and some new knowledge about the chorded arch bridge were obtained from this test, which provided reliable technical guarantee for the actual construction.

You might also be interested in these eBooks

Info:

[1] Zhixiang zhou, Construction for a New Chorded Arch Bridge Formed by Rotating Columns Down Vertically, China, ZL00130630.8[P]. 2003-10.

Google Scholar

[2] Shihong Jing, Hong Qiao, Yinhui Wang, Zhixiang zhou, Design of the Prestressed Concrete Rigid Frame Arch Bridge [J]. 2003, 3, pp.51-53.

Google Scholar

[3] Zhixiang zhou, Fang Li, Roy A Imbsen. Vertical Erection-rotation Method for Chorded Arch Bridge [J]. Structural Engineering International, 2009, 19(2): 142 148.

DOI: 10.2749/101686609788220222

Google Scholar

[4] Yanmei Gao , Exploration and Application of a Prestessed Concrete Rigid Frame Arch Bridge Formed by Rotating Columns down Vertically [D]. Chongqing Jiaotong University, 2005.

Google Scholar