Deposit Slope Failure Analysis and Prestressing Loss Study of Anchorage Cable

Article Preview

Abstract:

Slope project is often appearing in rock and soil engineering such as water conservancy, mine, highway and railway etc. And deposit slope is a special natural one. For probing into slope failure mechanism and prestressing loss of anchorage cable in deposit body, this paper researches it by numerical simulation. Study result shows: First, three leading influence factors, which are deposit slope lithology and structure, in-situ stress, and groundwater, may induce slope failure; Second, slope failure patterns chiefly includes landslide along the interface between bed rock and deposit, and part circular slippage in shallow deposit body; Last, it appears prestressing positive loss and negative loss of anchorage cable in study area, especially the latter occurs because of the slide interface existing in deposit body, and changing technical parameters of anchorage cable can partly improve prestressing loss.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 261-263)

Pages:

1374-1378

Citation:

Online since:

May 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Chen L, Qi Y J. Structural Characteristics of Deposit Body in Front of Dam on the Left Bank of Xiaowan Hydropower Station and Its Stability Study. Yunnan Water Power, Vol. 16, No.1 (2000), pp.26-30.

Google Scholar

[2] ZhangY J, Zhu W S. 2-D DEM and FEM Analysis on Stability of Deposit Body in Front of Dam on the Left Bank of Xiaowan Hydropower Station.Yunnan Water Power, Vol. 16, No.1 (2000), pp.36-39.

Google Scholar

[3] Wu N W. Slope Reinforcement of Deposit Body of Yunnan Xiaowan Hydropower Station. Geotechnical Engineering World, Vol. 8, No.10 (2005), pp.62-65.

Google Scholar

[4] Li H M, Zhong R H, Liu C. Modification of anchoring cables construction technique in Xiaowan hydropower station diversion channel slope on improvement of design, Yunnan Province. The Chinese Journal of Geological Hazard and Control, Vol. 16, No. S0 (2005), pp.7-11.

Google Scholar

[5] Pan H Y, Du J C, Hu X M, Hu D. Stability Anlalysis for the Accumulation Body with High Slope On the Left Bank in Front of Xiaowan Dam. Pearl River, No.4 (2000), pp.24-26.

Google Scholar

[6] Chang Z P, Zhang D Y. Anchorage Cable Testing Construction on Left Bank of Xiaowan Hydropower Station. Hydropower Design, Vol. 20, No.4 (2004), pp.58-60.

Google Scholar

[7] Gu D Z. Geological Mechanics Basis of Rock body Engineering. ( Science Press, Beijing 1979).

Google Scholar

[8] Cai M F, He M C, Liu D Y. Rock Mechanics and Engineering, ( Science Press, Beijing 2002).

Google Scholar

[9] Shiotani T. Evaluation of long-term stability for rock slope by means of acoustic technique. NDT & E International, Vol. 39 (2006), pp.217-228.

DOI: 10.1016/j.ndteint.2005.07.005

Google Scholar

[10] Zhen J C. Prestressing Anchorage Cable Applied in Reinforcing Road Landslide. Roadbed Engineering, No.1 (2008), pp.198-199.

Google Scholar

[11] Liu X N, Wang G J, Chen Z R. Dynamic design of slope excavation works of Xiaowan Hydropower Station. Water Power, Vol. 30, No.10 (2004), pp.30-32.

Google Scholar

[12] Li J L, Deng H F, Huang J W, Wang L H, Yang X T. Influencing Factors Analysis of Anchorage Prestressing Loss in Unload Rock Body. Rock and Soil Mechanics, Vol. 26, No. S0 (2005), pp.292-295.

Google Scholar