Study on Optimization of Core Pillar in Large-Span Tunnel Excavated with Double-Side Heading Method

Article Preview

Abstract:

Based on the underground Hongtudi station of Chongqing Rail Transit Line VI, stress and plastic strain of surrounding rock, internal forces of supporting structure and vault settlement are calculated in different widths of core pillar. Comprehensive analyses indicate that there is an optimal value of core pillar width in the construction of tunnel with the double-side heading method. Width of core pillar, 0.3 times as large as the tunnel span, is suggested in other projects with the same construction method, which is of great significance in practices.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 261-263)

Pages:

1882-1885

Citation:

Online since:

May 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Taoming Guo, Dewu Li and Yan Song: Journal of Lanzhou Jiaotong University Vol. 26(2007), p.34–37,in Chinese.

Google Scholar

[2] Fuming Huang, Heng Kong, Mengshu Wang et al.: Chinese Journal of Rock Mechanics and Engineering Vol. 24(2005), p.521–525,in Chinese.

Google Scholar

[3] Dongwu Xie: Tongji University Master (2007), p.1–95,in Chinese.

Google Scholar

[4] Zhenxia Liu: Journal of Modern Transportation Technique Vol. 3(2005), p.55–57,in Chinese.

Google Scholar

[5] Wenbing Deng: West-china Exploration Engineering Vol. 3(2008), p.157–160,in Chinese.

Google Scholar

[6] Zhigang Li, Wenqi Ding and Zhongcun Yang: Journal of Underground Space and Engineering Vol. 3(2007), p.627–632,in Chinese.

Google Scholar