[1]
Zong Si-sheng, Yu yong-ling, Shi Jin-fa. Study on Visualization Service for Scheduling Optimization. Manufacturing automation, 2011,03:39-41.
Google Scholar
[2]
Zong Si-sheng, Yu yong-ling, Shi Jin-fa. Study on Visualization Service for Scheduling of ERP application. Manufacturing automation, 2011,01:4-6.
Google Scholar
[3]
LIU Xin-chuang, QIU Hong-ze, WEI Er-you, SU Zhao-feng. Improving performance of evolutionary algorithm by adding elite solutions to population during evolution process Application to deal with flexible job-shop scheduling problem. Computer engineering and Applications, 2010,46 (17):48-51.
Google Scholar
[4]
Xuyan, Chen Xin-du, Chenxin. Key Techniques of System Integration and Application on PDM and ERP. China Mechanical Engineering, 2007,18(3):296 -299.
Google Scholar
[5]
Luobin, Panjian, Ma Xiao-xing. Architecture-oriented Visual Environment for Service Integration Artemis-VIDE. Computer Scince, 2006,33(6):242-246.
Google Scholar
[6]
Chen Qi-qi, Ye Wen-hua. Research of the job-shop scheduling problem with due date and capacity constrains. Manufacturing automation, 2009,31(3):32 -35.
Google Scholar
[7]
Huang Jin-gui. Multi-resource scheduling of grid job with precedence chain constraints. Computer Engineering and Applications, 2009,45 (6):48-51.
Google Scholar
[8]
Zhao Liang-hui, Deng Fei-qi. A simulated annealing algorithm on solving job shop scheduling problem. Manufacturing automation, 2006,28(3):10-23.
Google Scholar
[9]
Jindi Zhao. Design and Implementation of Integration of PDM and ERP. CAD/CAM and manufacturing information, 2009,12.
Google Scholar
[10]
Houxiang Wang, Zhiqiang Jiao, Juan Li. Construction of SOA life cycle model in dynamic ERP system. Computer Engineering and Design, 2009,20.
Google Scholar