Displacement of Elevator Boom Interference and Suppression on Rated Capacity

Article Preview

Abstract:

According to the effective of the displacement of crane boom to rated capacity, establishing a mechanical model with a prototype. After calculation and analysis, take drastic measures to ensure the rated lifting capacity. And the measures are worth popularizing.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 308-310)

Pages:

293-298

Citation:

Online since:

August 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] National Standards of China. Assembly of Standards of Construction Crane, Comprehensive, construction winches and crawler cranes. Standards Press of China, (2006). In Chinese.

Google Scholar

[2] Zhiwen Zhang, Heqian Yu and Jinnuo Wang: Handbook of crawler crane design, Beijing, China machinery press, (1989). In Chinese.

Google Scholar

[3] National Standards of China. Specifications of crawler crane design (GB/T 3811-2008), Standards Press of China, (2008). In Chinese.

Google Scholar

[4] Gening Xu: Metal structure design of crawler crane, Beijing, China machinery press, (1995). In Chinese.

Google Scholar

[5] Weitao Li: Research on performance of crawler crane and software development, master degree dissertations of northeastern university, (2010). In Chinese.

Google Scholar

[6] Kogan Josef: Lifting and conveying machinery, possibilities and ideas, Israel, Ideal Ltd., (1985).

Google Scholar

[7] Howard I. Shapiro: Cranes and Derricks, Mcgraw-hill Book Company, America, (1980).

Google Scholar