Optimization on the Bottleneck Process of 63PF2 Conveying Chain Assembly

Article Preview

Abstract:

Aiming at the problem of more difficult and low efficiency to assembly 63PF2 conveying chain, the work measurement, action research and production line balancing method are studied, and the data of 63PF2 conveying chain assembly lines is obtained. Taking 63PF2 conveying chain assembly lines for example and using industrial engineering foundation of stopwatch time study, two-handed operation analysis, process flow analysis and quality management of fishbone diagram, the problems existing in 63PF2 conveying chain assembly process are analyzed. And then the work site preliminary optimization is carried out. The bottleneck process of assembly process is optimized and improved. And the balance of assembly line is optimized, so as to improve the transmission chain assembly efficiency.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 308-310)

Pages:

734-738

Citation:

Online since:

August 2011

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Jiansha Lu: Lean production (Industrial Engineering Institute of Zhejiang University, Zhejiang, 2008).

Google Scholar

[2] Yuqiang Shi. Journal of Southwest University of Science and Technology, 2009, (03), p.57

Google Scholar

[3] Yongcheng Cheng. Journal of Tongji University, 2003, (06), p.27

Google Scholar

[4] Liwen Liu: Production and operation management (Tsinghua University Press, Beijing, 1998).

Google Scholar

[5] Aihu Wang. Industrial Engineering and Management, 2004, (05), p.83

Google Scholar

[6] Ai Wu: Quality management (Jinan University Press, Guangdong, 2003).

Google Scholar