Application of Reliability Centered Maintenance in a Hydrocracker

Article Preview

Abstract:

The paper presents a case study: the review of the reliability centered maintenance (RCM) methodology realized in a hydrocracker. Applying of the reliability centered maintenance methodology, it finds 495 failure modes and ranks risk priorities for the 98 rotating machineries in the hydrocracker. According to the results of risk analysis, it provides customized maintenance strategies for each component of the hydrocracker, which would improve the safety of the hydrocracker effectively. The review provides helpful reference for other equipments in refinery factories.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 317-319)

Pages:

1837-1842

Citation:

Online since:

August 2011

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Hwang W, Tien S, Chang R. :Journal of the Chinese Institute of Chemical Engineers. Vol.37-6(2006), pp.579-587.

Google Scholar

[2] Cen Liu, Wang-ping Huang, Hongkui Du, Honghui Cheng: General Machinery. Vol.12(2005), pp.8-9.(in Chinese)

Google Scholar

[3] Islam H.Afefy: Engineering. Vol.2(2010), pp.863-873.

Google Scholar

[4] The project team in Beijing University of Chemical Technology: The RCM report in a hydrocracker.(2009). (in Chinese)

Google Scholar

[5] Moubray John: Reliability-centred Maintenance (China Machine Press, Beijin 1995).

Google Scholar

[6] R. Keith Mobley: Root cause failure analysis (Butterworth-Heinemann, Wakefield 1999).

Google Scholar