Research Summary of Re-Manufacturing Logistics System in China

Article Preview

Abstract:

This paper reviews the main literature researches on remanufacturing logistics system in recent years in china, outlines the main research results from three aspects: the nature and characteristics of re-manufacturing logistics system, the layout of re-manufacturing logistics network and re-manufacturing logistics system management, and makes further research prospects in the end.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

192-196

Citation:

Online since:

August 2011

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] http://finance.sina.com.cn/leadership/msypl/20110321/18209568127.shtml

Google Scholar

[2] B.SH.XU:Re-manufacturing project and its progress in China,China surface engineering.Vol.23(2010),P.1-6.

Google Scholar

[3] SH.CH.XIA,L.W.XI:Research state and development trends of Re-manufacturing logistics network.Industrial Engineering and Management.Vol.5(2002),pp.20-24

Google Scholar

[4] L.WANG:Study on Auto reverse logistics network facility location in Loop supply chain,Chang'an University,(2008).

Google Scholar

[5] W.M.DI,Z.J.MA:Multi-cycle planning methods of optimization design of Manufacturing/remanufacturing logistics network,Journal of Southwest Jiaotong University.Vol.44(2009),pp.122-127

Google Scholar

[6] X.CUI,B.LI:A way for re-manufacturing logistics network Facility Location optimization,System Management.Vol.17(2008),pp.343-347.

Google Scholar

[7] Q.L.GU:Study progress of re-manufacturing/manufacturing integrated supply chain,Journal of Tianjin Institute of Technology.Vol.19(2009),pp.1-5

Google Scholar

[8] J.P.XIE,R.Q.CHEN:Cost-benefit analysis model of reverse logistics of product recycling, MARKET.Vol.(2003),pp.25-28

Google Scholar

[9] N.N.YAN,X.Y.HUANG,J.W.XU:Closed-loop dynamic operating model for supply chain with product re-manufacturing,Industrial Engineering and Management.Vol.5(2007),pp.37-42.

Google Scholar

[10] SH.L.XIAL.F.XI,Z.W.HU:Robustness design of re-manufacturing logistics network based on experimental design,Computer Integrated Manufacturing Systems.Vol.11(2005),pp.1705-1709

Google Scholar

[11] X.F.WAN,X.L.XU,L.ZHOU:The Bullwhip effect analysis of Manufacturing/re-manufacturing hybrid system,Journal of Nanchang University-Science.Vol.28(2004),pp.192-196

Google Scholar

[12] Y.DAI,Z.J.MA:the optimal production quantity model of manufacturing/re-manufacturing hybrid system,Journal of Southwest Jiaotong University.Vol.41(2006),pp.116-121.

Google Scholar

[13] J.Y.GE,P.Q.HUANG:Channel selection and coordination strategy of price dependent closed-loop supply chain.Industrial Engineering and Management.Vol.12 (2007),pp.29-34

Google Scholar

[14] X.X.Z,Q.ZHANG:Differential pricing efficiency analysis and operational Mechanism study of closed-loop supply chain.Journal of Beijing Jiaotong University(Social Sciences).Vol.9 (2010),pp.41-45.

Google Scholar

[15] D.M.MA:Coordination mechanism study of manufacturing/remanufacturing loop supply chain system.Information Technology & Standardization,Vol.3(2008),pp.42-46.

Google Scholar

[16] G.CHEN:Study on reverse logistics network optimization design of re-manufacturing in uncertain environment,Central South University,Changsha,China.(2008),P.27.

Google Scholar

[17] SH.L.XIA,L.F.XI,Z.W.HU:Robustness design of remanufacturing logistics network ,Machine Design and Research.Vol.20(2004),pp.68-72

Google Scholar

[18] H.J.MAO,X.ZH.JI:Expectation model based on random uncertainty of Remanufacturing Reverse Logistics Network Location of,China Surface Engineering.Vol.19(2006),pp.130-133

Google Scholar

[19] J.H.CHEN,CH.D.SHI:Contract design of re-manufacturing loop supply chain based on third party recycling,Industrial Engineering and Management.Vol.15(2010),pp.17-21

Google Scholar

[20] J.F.LI,Y.Y.QIAN:Construction and simulation optimization of reverse logistics network of used appliances,Journal of Shanghai University of Technology.Vol.31(2009),pp.569-572

Google Scholar

[21] L.SHI,L.XING:Economic analysis of model construction of reverse logistics of waste household appliances,China Population Resources and Environment.Vol.18(2008)pp.23-26

Google Scholar

[22] Q.L.GU,J.H.JI:Stochastic Optimal Control of integrated inventory of market-based re-manufacturing/manufacturing system, Systems Engineering Theory&Practice.Vol.26 (2006),pp.53-59.

Google Scholar

[23] X.N.QIAO,H.J.MAO,X.H.LI:Inventory control strategy of re-manufacturing reverse logistics based on Non-zero lead time,China's manufacturing industry information.Vol.36 (2007),pp.17-21.

Google Scholar

[24] K.Y.ZHANG,G.H.ZHOU:Differential pricing strategies study of closed-loop supply chain with product recycling sector.Mathematics in Practice and Theory.Vol.38(2008),pp.19-5.

Google Scholar

[25] X.WANG,X.Q.TAO:Study on a RFID-based car recycling model and its application,Environmental Pollution and Control.Vol.8(2010), pp.94-98

Google Scholar

[27] D.XIAO,P.Q.HUANG:Inventory Strategies of Closed Loop Supply Chain based on the time value of product. Management Engineering.Vol.22 (2008),pp.146-148.

Google Scholar

[26] N.M.WANG,Q.S.ZHANG:Re-manufacturing Batch decision with limited storage capacity.Operations Research and Management.Vol.17(2008),pp.7-15.

Google Scholar

[28] Z.Q.HUANG,R.H.YI,Q.L.DA:Efficiency Analysis of decisions Structure of the closed-loop Re-create Supply Chain with third party responsible for recycling. China Management Science.Vol.16 (2008),pp.73-77.

Google Scholar

[29] Y.K.LIU,M.Y.LAI:RFID-based re-manufacturing logistics system design of electronic products,Logistics Technology.Vol.6(2006),pp.21-23

Google Scholar

[30] J.ZH.CHEN:Re-manufacturing Inventory Optimization Theory Study.Tianjin:Nankai University, (2003).

Google Scholar

[31] J.P.ZHOU,L.H.CHEN:Re-manufacturing logistics network design research,Machinery Manufacturing.Vol.489(2005),P.34-35.

Google Scholar

[32] L.W.XIE,J.J.ZHONG:Re-manufacturing logistics supply chain study,China Manufacturing Information.Vol.33(24), pp.76-82

Google Scholar

[33] Q.L.GU:Research development of Re-manufacturing/manufacturing integration supply chain. Journal of Tianjin University of Technology and Education.Vol.19(2009),pp.1-9

Google Scholar

[34] B.H.LIU,B.SH.XU:Comprehensive evaluation index system design of re-manufacturing.Journal of Inspection and Quarnane.Vol.20(2010),pp.53-56

Google Scholar

[35] W.ZHANG,B.SH.XU:Application state of re-manufacturing research and development strategy.Journal of Academy of Armored Force Engineering.Vol.23(2009),pp.1-47

Google Scholar

[36] Q.L.GU,J.H.JI:Pricing management for closed-loop supply chain.Journal of Revenue & Pricing Management.Vol.1(2008),P.22-28.

Google Scholar