Study on Short-Term Behavior in Construction Safety Manufacturing Management Based on Rough Set

Article Preview

Abstract:

To investigate construction safety manufacturing management from the perspective of short-term behavior, the study first gets a massive first-hand data based on fully market research, then establishes a model and further analyzes what influences short-term behavior in construction enterprises, finally uses Rough Set to reduce these factors, and then determines what we should strengthen in construction safety management.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

201-206

Citation:

Online since:

August 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Fang Dongping, Study on economic loss Construction incidents, Construction Economics, No.3 (2000), pp.13-16

Google Scholar

[2] Fang dongping, Huang Xinyu, Jimmei Hinze, Engineering construction safety management, China Water Conservancy and Hydropower Publishing House (2003), pp.102-139

Google Scholar

[3] RowlinsonS. Construction Safety and Health Management. New Jersey, Prentice Hall (2000), pp.85-97

Google Scholar

[4] Hua-Yan, Wang Ji-zhi, Wang Dong. What kind of security management construction business needs,Civil Engineering Journal , No.3 (2003), pp.79-83

Google Scholar

[5] Zhang Wen-xiu, Qiu Guofang. Uncertainty decision-making based on Rough Set, Tsinghua University Press (2005), pp.76-90

Google Scholar