[1]
Holdsworth L, Jenkins N, Strbac G. Electrical Stability of Large Offshore Wind Farms [C]. Seventh International Conference on AC-DC Power Transmission, 2001:156-161.
DOI: 10.1049/cp:20010535
Google Scholar
[2]
Gaofeng Fan, Haixiang Zhao, Huizhu Dai. The Impact and Countermeasure of Large Scale Wind Power on Power System [J]. Power System and Clean Energy, 2008,24(1):44-48.
Google Scholar
[3]
Feijoo A E, Cidras J. Modeling of Wind Farms in The Load Flow Analysis [J]. IEEE Transactions on Power Systems, 2002,15(1):110-115.
DOI: 10.1109/59.852108
Google Scholar
[4]
liew S N, Strba G. Maximizing Penetration of Wind Generation in Existing Distribution Network [J]. IEE Proceeding, 2002,149(3):256-262.
Google Scholar
[5]
Wiik J, Gjerde J O, Gjengedal Tetal. Steady State Power System Issues When Planning Large Wind Farms [C]. IEEE Power Engineering Society Winter Meeting, 2002.1:366-371.
DOI: 10.1109/pesw.2002.985021
Google Scholar
[6]
Li Zhu, Wenxia Pang, Zhihong Huo, Lei Yang. The Technology of Interconnecting Wind Farm With Power Grid [M].Beijing: China Electric Power Press,2011.1
Google Scholar
[7]
Guoyan Liang. Large-scale Wind Farms and Network Problems Caused by The Operation and The Countermeasures [J]. Popular Utilization of Electricity, 2010, 01(014):20-21.
Google Scholar
[8]
Ming Ting, Yichun Wu. Summary on Studies of Operation and Planning of Wind Power Generation Systems [J]. Power System Technology, 2003, 7(3):36-40.
Google Scholar
[9]
Qi Wang, Xiaohu Chen, Yanchao Ji. Connecting Large-Scale Wind-Turbines to Power Grid and Related Issues [J]. Modern Electric Power, 2005, 22(5):23-28.
Google Scholar
[10]
Chengxi Wang, Yuan Zhang. Wind Power [M]. Beijing: China Electric Power Press,2003.
Google Scholar
[11]
Chunliang Li, Liping He. Simulation Study on Maximum Injection Power of Wind Farm [J]. Guangdong Electric Power, 2008, 21(11):42-46.
Google Scholar
[12]
Yazhou Lei, Weisheng Wang, Yonghua Yin, Huizhu Dai. An Optimization Method for Determining Wind Power Penetration Limit in Power System under Static Security Constraints [J]. Proceedings of the Csee,2001,21(6):25-283
Google Scholar
[13]
Junling Wu, Shuangxi Zhou, Jianfeng Sun, Shousun Chen, Qinghe Meng. Analysis on Maximum Power Injection of Wind Farm Connected to Power System[J]. Power System Technology, 2004, 28(20):28-32
Google Scholar