Optimization and Tests on the Independent Advance of Ore Breaking with High Sublevel and Large Drift Interval

Article Preview

Abstract:

According to the mining conditions and equipment level of Xingshan iron mine, optimization research on the stope structural parameters of sublevel caving was made, and finally adopted the structure parameters with 15m sublevel height and 20m drift interval. In order to find out the rational independent advance of ore breaking under 15m×20m structural parameters, theoretical arithmetic and industrial tests were carried out. The tests show that the rational independent advance of ore breaking drift interval should be 3.4m, and the optimized structural parameters of 15m×20m×3.4m has excellent effects on reducing mining cost and improving mining recovery rate.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 361-363)

Pages:

120-124

Citation:

Online since:

October 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] H. An and X.B. Hu: Express information of mining industry, 21(9) (2005), p.6. In Chinese

Google Scholar

[2] Z.M. Dong, Q.X. Fan and C. Jin: Baosteel technology, S (2005), p.19. In Chinese

Google Scholar

[3] W.D. Zhu, P.Y. Yuan and Y.Z. Ju: Metal mine, 9(2009), p.12.In Chinese

Google Scholar

[4] C. Jin, Z.M. Dong, S.G. Gong, S.J. Yu, Y.X. Guang: Metal mine, 4(2000), p.16. In Chinese

Google Scholar

[5] X.B. Liu, X.J. Liu, H.R. Sun and J. Yao: Metal mine, 8(2004), p.22. In Chinese

Google Scholar

[6] J. Yu and D.W. Wang: Metal mine, 3(2008), p.26. In Chinese

Google Scholar

[7] R.G. Liu, J. Wang and G. Xu: Morden mining, 25(9) (2009), p.84. In Chinese

Google Scholar