The Erection Technology of Pile Foundation Construction Platform for the Sanmenkou Cross-Harbor Bridge

Article Preview

Abstract:

The south gate bridge of the Sanmenkou cross-harbor bridge at Xiangshan County lied in the East China Sea coastal waters. The foudation for the bridge pier in the water used bored piles, the greatest depth up to 42m. This article described the Program selection, design and construction methods about the construction trestle and platform when the piles foundation were built in the water.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 368-373)

Pages:

3032-3035

Citation:

Online since:

October 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Jin-quan Wang:The Construction Experiences of New Technologies from Exchange Meeting. 2008.

Google Scholar

[2] Wen-yuan Yang and Ben Xu: Bridge Construction Engineer Handbook(China Communication Press, China 2003).

Google Scholar

[3] Si-min Yang,Peng-fei Zhang and Jian-zhou Shi: Highway, vol. 03(2006),P.6

Google Scholar

[4] Ye-kun Gui,Shi-zhong Qiu:Special Technical Handbook for Construction of Bridges(China Communications Press,China 2005).

Google Scholar

[5] JTG/T F50-2011:Technical specifications for construction of Highway Bridges and culverts(China Communications Press,China 2011).

Google Scholar

[6] Zhuo Chen, De-qing Liu:World Bridges, vol.02(2007 ),P.25

Google Scholar