Total Productive Maintenance - Accelerating OEE in a Manufacturing Industry Leveraging Pervasive Technologies

Article Preview

Abstract:

Total productive maintenance (TPM) is a people-intensive, preventive maintenance system for maximizing equipment effectiveness in the enterprise. The concept of TPM was originally suggested by Nakajima (1988) who proposed overall equipment effectiveness (OEE) as a metric for evaluating the progress of TPM, which is interpreted as the multiplication of availability, performance and quality. This paper aims to study and investigate the implementation of a TPM to improve the OEE in manufacturing enterprises. In today’s industrial scenario huge losses occur in the manufacturing shop floor. These losses are due to operators, maintenance personal, process, tooling problems and non-availability of components in time etc. The quality related waste are of significant importance as they matter the company in terms of time, material and the hard earned reputation of the company. There are also other invisible losses like operating the machines below the rated speed, start up loss, break down of the machines and bottle necks in process. Zero oriented concepts such as zero tolerance for losses, defects, break down and zero accidents are becoming a pre-requisite in the manufacturing and assembly industry. In this situation, a TPM is the answer to resolve the above said problems which helps in benefitting the growth prospects of any organization.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 383-390)

Pages:

4568-4575

Citation:

Online since:

November 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Abdul Ghani K., Jayabalanb V., and Sugumarc M. (2002) Impact of advanced manufacturing technology on organizational structure, Journal of High Technology Management Research, Vol. 13, p.157–175.

DOI: 10.1016/s1047-8310(02)00051-2

Google Scholar

[2] Al-Ahmari A.M.A. (2002)Implementing CIM systems in SMEs, International Journal Of Computer Applications in Technology, 15, pp.122-127.

DOI: 10.1504/ijcat.2002.000287

Google Scholar

[3] Sambasivarao, K.V. and Deshmukh, S.G. (1995).

Google Scholar

[4] Meredith, J.R. and Suresh, N.C. (1986), Justification Techniques for Advanced Manufacturing Technologies, International Journal of Production Research, Vol. 24, No. 5, pp.1043-1057.

Google Scholar

[5] Currie, W.L. (1989), The Art of Justifying New Technology to Top Management, Omega, Vol. 17, No. 5, pp.409-418.

DOI: 10.1016/0305-0483(89)90038-8

Google Scholar

[6] Chiadamrong N., (1999) An integrated fuzzy multi criteria Decision making method for the manufacturing strategies selection, Computers & Industrial Engineering 37, pp.433-436.

DOI: 10.1016/s0360-8352(99)00111-4

Google Scholar

[7] Kahraman, C., Ruan, D., Dogan, I., (2003). Fuzzy group decision making for facility location selection, Information Science, 157, pp.135-153.

DOI: 10.1016/s0020-0255(03)00183-x

Google Scholar

[8] Satty,T. (1980). The analytic hierarchy process: planning, priority, allocation. McGraw-Hill Book Company , New York.

Google Scholar

[9] Dickson, G. W., An analysis of vendor selection systems and decisions, 1966, Journal of Purchasing, Vol. 2, p.5‐{TTP}8208 17.

Google Scholar

[10] Bernroider, E. & Koch, S. (2001). ERP selection process in midsized and largeorganizations. Business Process Management Journal 7(3), 251-257.

DOI: 10.1108/14637150110392746

Google Scholar

[11] Boehm, B.W., Brown, J.R., Kaspar, H., Lipow, M. MacLeod, F.J. & Merritt, M.J. (1978). Characteristics of Software Quality. TRW Series of Software Technologies 1, North-Holland, Amsterdam.

Google Scholar

[12] Buckley, J.J. (1985). Fuzzy hierarchical analysis. Fuzzy Sets and Systems 17, 233-247.

DOI: 10.1016/0165-0114(85)90090-9

Google Scholar

[13] Buss, M.D.J. (1983). How to rank computer projects. Harvard Business Review 61(1), 118-125.

Google Scholar

[14] Butler, J. (1999). Risk management skills needed in a packaged software environment. Information System Management 16(3), 15-20.

DOI: 10.1201/1078/43197.16.3.19990601/31311.3

Google Scholar

[15] Buyukozkan, G., Kahraman, C. & Ruan, D. (2004). A fuzzy multi-criterial decision approach for software development strategy selection. International Journal of General Systems 33(2-3), 259-280.

DOI: 10.1080/03081070310001633581

Google Scholar

[16] Nakajima, Seiichi, Introduction to Total Productive Maintenance, Cambridge, MA, Productivity Press, (1984).

Google Scholar

[17] Giegling, S., Verdini, W.A., Haymon, T. and Konopka, J. (1997).

Google Scholar

[18] Konopka, J. and Trybula, W. (1996), ``Overall equipment effectiveness (OEE) and cost measurement', Proceedings of IEEE/CPMT International Electronics Manufacturing Technology Symposium, pp.137-40.

DOI: 10.1109/iemt.1996.559707

Google Scholar

[19] Lungberg. O, Mearsument of overall equipment effectiveness as a basic for TPM activities. International Journal of operation. And production management1998. 18 (5) 495-507.

Google Scholar