Research on Schedule Planning Management of Railway Construction Project Based on CAS

Article Preview

Abstract:

The CPM and PERT are the most popularly used underlying method of schedule planning of construction project, Problematically, CPM and PERT depend on the experiences of project manager, which is not true in railway construction project. A huge deviation occurs between the actual progress and planned schedule. This leads to unreasonable allocation of resources and cost increment. Referring to the characteristics of schedule planning of railway construction projects, we proposed schedule planning conceptual model of railway construction project based on CAS. The model consists of three parts. They are master schedule, forecasting planning and operational planning. Forecasting planning is produced by master schedule and adjusted by operational planning dynamically. In addition, RBF neutral network is employed to improve the accuracy of master schedule. The paper provides novel viewpoint and idea for project management of railway construction.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 403-408)

Pages:

2560-2563

Citation:

Online since:

November 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] John H Holland, Hidden Order-How Adaptation Builds Complexity. Shanghai: Shanghai Scientific and Technological Education Publishing House, (2001).

Google Scholar

[2] Chen Yu. Complex adaptive system (CAS) theory and its application - the origin, content and inspiration〔J〕. System dialectical study Sinica, 2001, 9 (4) : 5-39.

Google Scholar

[3] Hameri A P, N itter P. Engineering data management through different breakdown structures in a large scale project〔J〕Internat ional Journal of Project Management, 2002, 20: 3752384.

DOI: 10.1016/s0263-7863(01)00029-1

Google Scholar

[4] LU Xin-hong. Fuzzy Reasoning and Identifying Construction Duration〔J〕. Optimization of Capital Construction,1999,20(5): 18-21.

Google Scholar

[5] FANG Zi-fan, Zhen Xiao-zhong, Zhu Qiao-sheng. Research on Fuzzy Construction Periods of Project〔J〕. Journal of China Three Gorges University(NaturalSciences),2001, 23(5): 442-445.

Google Scholar

[6] Z. X Sun. Intelligent control theory and technique. Beijing: Tsinghua University Press, (1997).

Google Scholar

[7] H.Y. Wang, G.D. Shi. Artificial neural network technique and application. China Petrochemical Press, Beijin.

Google Scholar