[1]
YAO Pengfei, ZHOU Shaohua. Research on the Production Schedul ing Method for Paper-making Enterprises Based on Theory of Constraints[J]. Indust rial Engineering and Management, 2009, 14(5): 122-128.
Google Scholar
[2]
Chen Jie, Chen Dong, Ma Yizhong. Study on Hybrid Production Scheduling Based on TOC[J]. China Mechanical Engineering, 2006, 18(20): 2433-2439.
Google Scholar
[3]
XIA Rui, WU Wei, HE Minwei. Research into Bottleneck Analyzing and Task-scheduling Based on the Theory of Constraints[J]. Control and Instruments in Chemical Industry, 2006, 33(4): 21-24.
Google Scholar
[4]
M.R. Bowers L.A. Kaplan T.L. Hooker. A two-phase model for Planning the production of aluminum ingot[J]. Europen Journal of Operational Research, 1995, (81): 105–104.
DOI: 10.1016/0377-2217(93)e0233-n
Google Scholar
[5]
Goldratt Eli. The General Theory of Constraints[M]. Port land: Productivity Press, (1989).
Google Scholar
[6]
Schwindt,N. Trautmann. Scheduling the production of rolling ingots: industrial context, model, and solution method[J]. International Transactional in Operational Research, 2003(10): 547–563.
DOI: 10.1111/1475-3995.00427
Google Scholar
[7]
EKREM DUMAN, MEHMET BAYRAM YILDIRIM, ALI FUAT ALKAYA. Scheduling continuous aluminum casting lines[J]. International Journal of Production Research, 2008, 46(20): 5701-5718.
DOI: 10.1080/00207540701355212
Google Scholar
[8]
Anantaram Balakrishnan. Process planning for aluminum tubes: An engineering-operations perspective[J]. Operations Research, 1996, 44(1): 7-20.
DOI: 10.1287/opre.44.1.7
Google Scholar
[9]
M.A. Hariga. A Production Planning Model for an Aluminum Company[J]. King Sand Uiv., 1994, 6(Eng. Sci. 2): 241-264.
Google Scholar
[10]
MARC GRAVEL, WILSON L. PRICE and CAROLINE GAGNEÂ. Scheduling jobs in an Alcan aluminium foundry using a genetic algorithm[J]. INT. J. PROD. RES., 2000, 38(13); 3031–3041.
DOI: 10.1080/00207540050117422
Google Scholar