Environmental Risk Assessment of General Contractor’s EPC Project

Article Preview

Abstract:

For the problem of EPC project environmental risk were affected by a number of uncertainties, this paper improved the environmental risk indicators system of project and used unascertained functions and entropy functions comprehensively , proposed environmental risk assessment methods based on unascertained – entropy theory and clarified specific steps of the method according to a general contractor project example. The empirical research shows that the method is effective and feasible and the evaluation results are reasonable

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 424-425)

Pages:

389-394

Citation:

Online since:

January 2012

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Li Guangfu, Chen Xiaoli. Project Risk Assessment Base on Delphi Method Vol2007. 23(1): 23~26.

Google Scholar

[2] Li Wanqing, Yan Guanzhuo. The Application of AHP in Comprehensive Evaluation of Construction Enterprise. Vol2007. 10(6): 5~6.

Google Scholar

[3] Shen Jianming, Zhen Dongliang, Hu Xiaobin. Project Risk Management. Vol2010. 15–18.

Google Scholar

[4] Xiao Limin. The Risk Warn in Study International Engineering Contract Vol. (2006).

Google Scholar

[5] Zhao Yumei. The Study Communication Construction Project Risk Management in EPC (2003).

Google Scholar

[6] Li Wanqing, MLihua, Men Wenqing. The Application of Unascertained-entropy right in Comprehensive Evaluation of Safety Fully-mechanized Face. Vol. 2007, 32(6): 612~616.

Google Scholar

[7] Liu Kaidi, Wu, He qing, Pan Yanjun, Uncertain Information Mathematic Treatment and Application. Vol. (1999).

Google Scholar

[8] Li Wanqing, Zhou Chong, Men Wenqing. The Application of Unascertained Mathematics Safty of Construction. Vol. 2006, 23(2): 83~85.

Google Scholar