Mining Plan Optimization Based on Linear Programming in Shirengou Iron Mine

Article Preview

Abstract:

Faced with the difficult situation of the joint operation of open pit and underground mining in transition period in Shirengou Iron Mine, a suitable linear programming mathematical model of mining plan was established and synthesis optimization results were obtained, which would increase the overall economic effect of the mining operation during the transition period, while the limited reserves and ore quality control were entirely considered. A pronounced economic benefit was achieved by the project optimization. This mathematical model can be widely used in mining process to control the quality and quantity equilibrium of ore output, comprehensive utilize some waste rock and optimize the mining plan.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

206-209

Citation:

Online since:

January 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] ZHANG Li-fu, HU Qing-huai, The research on multi-mine exploration plan by linear programming[J]. Journal of Wuhan Institute of Technology, 2004(1): p.88~91.

Google Scholar

[2] ZHU Ming, LIU Wen-sheng, LIANG Gang, Utilization of Match Excavation by Linear Programming in Limestone Mine [J]. INDUSTRAL MINERALS & PROCESSING, 2006(5): p.32~33, 37.

Google Scholar

[3] Ying ZHANG, Yong ZHAO, Qiwei LU, et al., Optimization model of truck flow at open-pit mines and standards for feasibility test[J]. International Journal of Minerals, Metallurgy and Materials. 2004(5): p.389~393.

Google Scholar

[4] FANG Zhi-heng, WANG Li-guan, JIA Ming-tao, et al., APPLICATION OF LINEAR PROGRAMMING IN RAISING MINE ECOMOMIC EFFICIENCY. China Molybdenum Industry, 2008(3): p.54~56.

Google Scholar