Risk Assessment Regarding Tailings Dam Break

Article Preview

Abstract:

An assessment approach in regard to tailings dam break would be analyzed and established in aspects of life, property and environment & resources loss in the essay. Tailings bam break hits local social economy varying with region as a result of particular and specialized space diversity. With the simple and practicable approach, it is quite reasonable to accomplish quantitative assessment of risk as well as review controlling priority to potential risk arising from tailings reservoir.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 433-440)

Pages:

1864-1868

Citation:

Online since:

January 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] GB6721-86. Statistical Standard to Injury Suffered by Staff & Workers of Enterprises. Standardization Administration of the P. R China, (1986).

Google Scholar

[2] Lin Yu-shan and Zhang Wei, Geohazard and risk assessment for tailing reservoir,. Journal of Guilin University of Technology, Vol. 26 Issue 4, 2006, pp.486-490.

Google Scholar

[3] Chen Qingsheng, Sun Jianhua. Calculation of Tailings Flow Due to Dam Break,. Journal of Hohai University, Vol. 23 Issue 5, 1995, PP. 99-105.

Google Scholar

[4] Yuan Bing, Wang Feiyue, JIN Yongjian, ect. Study on the Model for Tailing Dam Breaking and Its Application,. China Safety Science Journal, Vol. 18 Issue 4, 2008, pp.169-172.

Google Scholar

[5] A Guide to inspect and manage hidden dangers of work safety. Chinese Academy of Governance Publications, (2010).

Google Scholar

[6] Zhao Yuan, Liu Xilin. Assessment on debris flow disaster losses,. The Chinese Journal of Geological Hazard and Control, Vol. 16 Issue 3, 2005, pp.42-48.

Google Scholar

[7] Liu Changli. Aessessment of Geological Environmental Risk in Economics, PhD thesis, Chinese Academy of Geological Science, 2007, PP. 76.

Google Scholar