Risk Analysis on the Accident of TBM’s Cutterhead Jamming Caused by Collapse of Tunnel
Abstract:
If TBM does the excavating work in jointed rock mass, the cutterhead may be jammed. In order to decrease the loss, it is necessary to carry out risk evaluation. Whether the cutterhead is jammed or not depends on the relationship between torque and resistance torque. The magnitude of resistance torque depends on height of collapse, so according to the randomicity of height of collapse and probability theory, a formula for calculating the probability of cutterhead jamming is established. Meanwhile, according to the magnitude of resistance torque and cutterhead’s parameters, consequence of cutterhead jamming is divided into five ranks. Based on probability and consequence ranks, risk evaluation matrix for TBM’s cutterhead is proposed. The research results are demonstrated logically by the calculation of practical engineering.
Info:
Periodical:
Pages:
2246-2250
Citation:
Online since:
January 2012
Authors:
Price:
Сopyright:
© 2012 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: