The Control Study of Mass Concrete Floor Temperature Crack

Article Preview

Abstract:

Analysis the factors of mass concrete temperature crack. Combined with the Nan Yang Branch of CUCC cement clinker production line of the second phase of mass concrete construction, it proposed some measures about how to prevent the temperature stress crack of mass concrete due to hydration heat of cement generated temperature difference .By controlling the temperature of the concrete strictly, decreasing the temperature difference between inside and outside, preventing shrinkage joint, reducing the slump loss, delaying setting time, etc. To ensure from the construction maintaining process of mass concrete foundation floor, the tensile strength of concrete is always greater than the maximum temperature tensile stress to prevent temperature cracks appear ensure the quality of mass concrete construction.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 446-449)

Pages:

3318-3322

Citation:

Online since:

January 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Bofang Zhu: Temperature Stress and Temperature Control of Mass Concrete (China Electric Power Press, Beijing 1999).

Google Scholar

[2] Tiemeng Wang: Engineering Structure Crack Control (China Architecture & Building Press, Beijing 2002).

Google Scholar

[3] LihaiPeng, Shiqin Yan, and Chunsheng Zhang: Temperature Control and Crack Prevention of Mass Concrete (Yellow River Conservancy Press, Zhengzhou of Henan 2005).

Google Scholar

[4] Mingsheng Liu, Yaofu Shi, and Jianming Liu, in: Construction Technology of Foundation Bedplate Mass Concrete in Summer, volume 35 of Construction Technology, period, 11 (2006).

Google Scholar

[5] Fuda Yin, in: Construction of Mass Concrete Bottom Plate, volume 35 of Construction Technology, period, 7 (2006).

Google Scholar