Design and Implementation of Combined Temporary Road and Permanent Road Construction

Article Preview

Abstract:

Through designing of combined temporary road and permanent road construction, analyzing the main existed problems and providing the relevant measure, the case of implementation of a new large workshop district is introduced. It is favorable to rationally use of the existing resources, save construction investment and construction time.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 450-451)

Pages:

1167-1170

Citation:

Online since:

January 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Construction and quality acceptance specification of urban road engineering(CJJ1-2008)[S]. Ministry of Housing and Urban-Rural Development of the People's Republic of China. 2008. (In Chinese)

Google Scholar

[2] Construction and quality acceptance specification of water pipeline engineering(GB50268-2008)[S]. Ministry of Housing and Urban-Rural Development of the People's Republic of China. 2008. (In Chinese)

Google Scholar