Robustness Optimization Based on PERT in the Civil Aircraft Supply Network

Article Preview

Abstract:

The civil aircraft’s manufacturing process is complicated because of its complex structure and various parts in need. The stability and high efficiency of the based supply network decides the coordination ability among departments and the development cycle completion date. Now it’s very urgent to study the robustness of the collaborative supply network. This paper optimized and designed the robustness of the civil aircraft supply network, first with the project evaluation and review technique (PERT) we set a supply network model; then optimized the critical path to make the system functions remain constant, and the civil aircraft supply network robustness got optimized

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 452-453)

Pages:

147-152

Citation:

Online since:

January 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Dang Weibing. Research on supplier management technology for large commercial aircraft collaborative development [D]. Shanghai University, 2011. 5.

Google Scholar

[2] Alan MacPherson, David Pritchard. The international decentralization of US commercial aircraft production: implications for US employment and trade. Futures, 2003, 35: 221-238.

DOI: 10.1016/s0016-3287(02)00055-1

Google Scholar

[3] Cao Lizheng. The application of CPM in the IT project management [J]. Management and innovation: 89.

Google Scholar

[4] Dong Ming, Peng Ying. The Robustness Metrics for Supply Chain Network Design [J]. Journal of shanghai jiaotong University, 2007, 41(7): 1092-1096.

Google Scholar

[5] Xu Jiawang, HuangXiaoyuan. A multi-objective optimization model for supply chain with uncertain market supplies and demands [J]. Industrial Engineering and Management, 2007, 12(2): 7-11.

DOI: 10.1109/wcica.2006.1712575

Google Scholar

[6] Kelley JE (1961) Critical path planning and scheduling mathematical basis. Operation Research 9: 296-320.

Google Scholar

[7] Jiang Xiaowei. Research and development of distribution network MIS based on integration of DRP & CPM [D]. Zhejiang University, (2002).

Google Scholar

[8] Yang Huabao, Wang Heping, Ai Jianliang. Aircraft principles & structures[M] . Xian: Northwestern polytechnical university press. 2002. 4.

Google Scholar

[9] Xu Zhonglan. Application and Analysis for the CPM in the enterprise project management [J]. Tianjin vocational college joint journal, 2007, 9(3): 143-145.

Google Scholar

[10] Li Xueguang, Zhang Shuren, Miao Liqin. Application for the CPM in the manufacturing industry [J]. The mechanical design and research, 2007, 23(6): 86-88.

Google Scholar