[1]
David Hillson, Sabrina Grimaldi and Carlo Rafele. Managing project risks using a cross risk breakdown matrix. Risk Management,2006(8):p.61
DOI: 10.1057/palgrave.rm.8250004
Google Scholar
[2]
Project Management Institute,A Guide to the Project Management Body of Knowledge(PMBOK Guide) (YongWang,BinZhang)[M].Beijing:Publishing House of Electronics Industry,2009 (in Chinese)
DOI: 10.1556/9789634545019
Google Scholar
[3]
Minzheng Wang, Songjiang Wang. BOT Project Implementation Guide [M]. Kunming: Yunnan Science and Technology Press, 2002.7. (in Chinese)
Google Scholar
[4]
Zhengqiang Wang. Study on theory and application of large hydropower project risk analysis. TianJin:Tanjin University, Management Science and Engineering,2003 (in Chinese)
Google Scholar
[5]
Jinqiang Fu. Investment risk analysis to hydropower project and its application based on Montle Carlo Method. Tianjin:TanJin University,hydraulic structure engineering,2005 (in Chinese)
Google Scholar
[6]
Bin Wang. Study on the risk management method of construction project cost. WuHan: Huazhong University of Science and Technology,Management Science and Engineering,2006 (in Chinese)
Google Scholar
[7]
Haihong Sun, Xiaoshu Ye. Analysis of risk factors of project cost base on the Monte-Carlo Simulation. Journal of Chongqing Jianzhu University,2005(6),p.121 (in Chinese)
Google Scholar
[8]
Yadong Mei. Risk Analysis of Project Investment. Wuhan:WuHan University, Hydraulic Engineering,2004 (in Chinese)
Google Scholar
[9]
Jianbin Yang,Hui Zhang. Study on the dynamic risk management of WBS and RBS. Science Technology and Engineering.2009,9(14),p.4086 (in Chinese)
Google Scholar