WBS-RBS-Based Hydropower Projects Investment Risk Analysis

Article Preview

Abstract:

Water and hydropower projects often has a huge investment, as the project management developed, more and more private capital into the projects, the complication of fundraising channels will undoubtedly increase the risks of investment. The risk identification of investment for large-scale Water and Hydropower Projects is according to the project Work Breakdown Structure (WBS) and Risk Breakdown Structure (RBS), and then use the Monte Carlo simulation method for quantitative analysis.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 468-471)

Pages:

3065-3071

Citation:

Online since:

February 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] David Hillson, Sabrina Grimaldi and Carlo Rafele. Managing project risks using a cross risk breakdown matrix. Risk Management,2006(8):p.61

DOI: 10.1057/palgrave.rm.8250004

Google Scholar

[2] Project Management Institute,A Guide to the Project Management Body of Knowledge(PMBOK Guide) (YongWang,BinZhang)[M].Beijing:Publishing House of Electronics Industry,2009 (in Chinese)

DOI: 10.1556/9789634545019

Google Scholar

[3] Minzheng Wang, Songjiang Wang. BOT Project Implementation Guide [M]. Kunming: Yunnan Science and Technology Press, 2002.7. (in Chinese)

Google Scholar

[4] Zhengqiang Wang. Study on theory and application of large hydropower project risk analysis. TianJin:Tanjin University, Management Science and Engineering,2003 (in Chinese)

Google Scholar

[5] Jinqiang Fu. Investment risk analysis to hydropower project and its application based on Montle Carlo Method. Tianjin:TanJin University,hydraulic structure engineering,2005 (in Chinese)

Google Scholar

[6] Bin Wang. Study on the risk management method of construction project cost. WuHan: Huazhong University of Science and Technology,Management Science and Engineering,2006 (in Chinese)

Google Scholar

[7] Haihong Sun, Xiaoshu Ye. Analysis of risk factors of project cost base on the Monte-Carlo Simulation. Journal of Chongqing Jianzhu University,2005(6),p.121 (in Chinese)

Google Scholar

[8] Yadong Mei. Risk Analysis of Project Investment. Wuhan:WuHan University, Hydraulic Engineering,2004 (in Chinese)

Google Scholar

[9] Jianbin Yang,Hui Zhang. Study on the dynamic risk management of WBS and RBS. Science Technology and Engineering.2009,9(14),p.4086 (in Chinese)

Google Scholar