p.2032
p.2037
p.2042
p.2047
p.2052
p.2056
p.2061
p.2066
p.2071
Application of TSP in Construction of Qiupi Tunnel
Abstract:
The accuracy of TSP in tunnel geological prediction system is restricted to the conditions of construction site. In order to improve the accuracy of the prediction result, it is necessary to improve the collection accuracy. This article is for the angle to improvement of focal points, charging structure, optimizing the explosive charge, improvement of the detection holes for receiving conditions to improve the data precision. So that the focal point detonating degree guarantees at a higher level, the accuracy of the data is relatively well, and the interpretation results are more accurate.
Info:
Periodical:
Pages:
2052-2055
Citation:
Online since:
March 2012
Authors:
Price:
Сopyright:
© 2012 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: