Application of TSP in Construction of Qiupi Tunnel

Article Preview

Abstract:

The accuracy of TSP in tunnel geological prediction system is restricted to the conditions of construction site. In order to improve the accuracy of the prediction result, it is necessary to improve the collection accuracy. This article is for the angle to improvement of focal points, charging structure, optimizing the explosive charge, improvement of the detection holes for receiving conditions to improve the data precision. So that the focal point detonating degree guarantees at a higher level, the accuracy of the data is relatively well, and the interpretation results are more accurate.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 490-495)

Pages:

2052-2055

Citation:

Online since:

March 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Shihang Zhong: Chinese geophysical, Vol. 3(2006), p.204–205, in Chinese.

Google Scholar

[2] Jishan He, Jianxin Liu: Chinese Journal of Geophysics, Vol. 1(2004), p.293–298, in Chinese.

Google Scholar

[3] Hongwei Zhong: People's Yangtze river Vol. 1(2004), p.16–18, in Chinese.

Google Scholar

[4] Zhong Li: Geological exploration, Vol. 38(2002), p.76–78, in Chinese.

Google Scholar

[5] Zhaohuang Zheng: Chinese Journal of Geophysics, Vol. 37(1994), p.218–230, in Chinese.

Google Scholar

[6] Shuan Xiao Shilin Wu: Engineering geophysical journal, Vol. 1(2004), p.63–69, in Chinese.

Google Scholar

[7] Hui Zhong: the mining technology Engineering and construction, Vol. 7(2007), p.167–168, in Chinese.

Google Scholar

[8] Guohua Ding: Sino-foreign highway, Vol. 25(2005), p.107–110, in Chinese.

Google Scholar

[9] Ji Huang, Jianguo Peng Guohua: geological and exploration, Vol. 42(2006), p.3–106, inChinese.

Google Scholar

[10] Qizhen He Hailiang Li Zhong Yan: railway engineering journal, Vol. 4 (2000) p.81–85, in Chinese.

Google Scholar