Precise Study and Application of Long Distance Lead Forecast Technology in Tunnel

Article Preview

Abstract:

It is important to accurately previse the circumstances of the tunnel face in advance to realize a safe construction, because of the polytrope and indefinability to mountain ridge tunnel surrounding rock. However, it is also painful evaluating the detecting zone precisely because of the influence of complex geological conditions and uncertain interpreting outcome. With the study and application on long distance lead forecast in Sheng Ren Moutain tunnel of Mei Zhou-Da Pu highway using TSP48, this paper introduces the principle of parameters electing in data managing and detecting to achieve precisely explaining about the detecting zone. The interpretation is not only more close to practice, but also can provide a piece of reliable data to the construction, which can effectively promote the construction safe.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 490-495)

Pages:

417-422

Citation:

Online since:

March 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] G. H. Wang, G. M. Yang, J. Y. Zhang. Application of TSP Geological Forecast System; Jilin Science & Technology of Communications 2010(4): 48-50.

Google Scholar

[2] Q. W. Dai, G. He, D. S. Feng. Application of the TSP-203 system in geological Advanced prediction of tunnel; Progress In Geophysic; 2005, 20(2): 460-464.

Google Scholar

[3] J. J. Ma, L. K. Cheng, L. J. Cai. Present Situation of Research on Propagation of Blasting Stress Wave and Rock Fragmentation Effect in Remote Area; Blasting; 2005, 22(2): 17-21.

Google Scholar

[4] J. Gao. Tunnel leading the forecast of geological disasters in TSP system application method of processing data as research; Railway Engineering, 2006(10): 63-65.

Google Scholar

[5] Y. G. Xue, S. C. Li, Q. S. Zhang, S. C. Li, B. Liu. Application of TSP203 Advanced Prediction to Tunnel in Karst Areas; Chinese Journal of Underground Space and Engineering; 2007, 3(7): 1187-1191.

Google Scholar

[6] H. Li, Z. Q. Zhu, J. Li. The Aapplication of TSP203 System in the Rock Mass Classification; Chinese Journal of Engineering Geophysics; 2005, 2(6): 449-453.

Google Scholar

[7] L. Z. Du. The Study of Tunnel Seismic Geological Prediction Technology in the Process of Construction; (2008).

Google Scholar

[8] S. A. Xiao, S. L. Wu . Geological Prediction Technique for Tunnel Construction Under Complex Geological Conditions; Chinese Journal of Engineering Geophysics; 2004, 1(2): 63-69.

Google Scholar