The Research of the Status Quo and Development of UHV Transmission Lines Construction in China

Article Preview

Abstract:

The construction of UHV (ultra-high voltage) transmission lines has become an important part of the planning of “smart grid" and “solid grid” in China. This article elaborated in recent years the UHV transmission lines construction status and possible problems, has made a comparative analysis on the angle of environmental carrying capacity, and put forward three effective suggestions, in order to improve the construction efficiency of UHV transmission lines engineering.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 516-517)

Pages:

1555-1559

Citation:

Online since:

May 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Hao Zhou, Yu-Hong Yu: "Discussion on Several important problems of F developing UHV Ac Transmission in China", Vol. 29 (2005), pp.1-9

Google Scholar

[2] Nan Liu, Yuqi Wang:"Analytical approach to the influence factors of China's electric power demand", No 6(2008), pp.10-12.

Google Scholar

[3] Pengcheng Yang, Shuiming Chen:"Effect of Different Arresters on Switching Over voltages in UHV Transmission Lines ", Tsinghua Science and Technology, Vol.15 No.3, (2010), pp.325-328

DOI: 10.1016/s1007-0214(10)70069-9

Google Scholar

[4] Fengli Yang, Lingbo, Zifu Zhang:"Unbalanced tension analysis for UHV transmission towers in heavy icing areas ", Cold Regions Science and Technology, Vol.70, (2012), pp.132-140

DOI: 10.1016/j.coldregions.2011.07.008

Google Scholar

[5] Suonan, K.Song:"G.A Novel UHV/EHV Transmission-Line Pilot Protection Based on Fault Component Integrated Impedance", Power Delivery, IEEE Transactions on, Vol.26 No.1, (2011), pp.127-134

DOI: 10.1109/tpwrd.2010.2066292

Google Scholar