p.485
p.489
p.494
p.503
p.508
p.515
p.520
p.525
p.531
Open-Pit Mine Fine DEM Model Establishment and Updating
Abstract:
In view of open-pit mine complex special terrain, to improved method of constructing triangulated irregular net and combined with the extended boundary, that can remission the phenomenon that steps were flattened and the problem of inefficiency mining area model update. Using constrained triangulated irregular net once generation algorithm, through extraction of spatial data, establish topological relationships and spatial indexing, eventually build a constraints of triangulated irregular net within the boundary constraint line. Combining extended boundary with the triangulated irregular net generated algorithm, can realize the establishment partial model as well as partial and overall model splicing. Thus enhanced the efficiency of the mining area overall model updating.
Info:
Periodical:
Pages:
508-514
Citation:
Online since:
May 2012
Authors:
Price:
Сopyright:
© 2012 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: