Abstract:

Slide way is the base in building the large structure. Use float and drag method to install the large structure influenced by the hoisting equipment ability. To control the height of the large structure, need to add a girder structure at the bottom of the large structure after building it to make the structure hoist it to a few or dozens of meters to ship. To make force analysis and grasp the fulcrum stress of the large structure and the intensity of the girder structure and the slide way stress to make the system safe and provide technical support for the carrying out of the engineering.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 557-559)

Pages:

2147-2150

Citation:

Online since:

July 2012

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Changzheng Huang, Jianping Tan: Machinery Design & Manufacture(2005), p.69-p.71.

Google Scholar

[2] Wenhua Gao, Linde Yang: Journal of Tongji University(1999), Vol.6(27).

Google Scholar

[3] Chujian Deng, Guojie He: Chinese Journal of Geotechnical Engineering(2006).

Google Scholar

[4] Mingli Yan, Mingshan Wang, Xuefeng Yan, Donggang Zhang: Chinese Journal of Geotechnical Engineering(2003), Vol.25(3).

Google Scholar

[5] Application of ANSYS finite element software in composite foundation: Mine automation(2008), Vol.8(18).

Google Scholar

[6] Yiping Zhang, Yang Wang, Tao Li: rock and soil mechanics(2011), Vol.32(7).

Google Scholar