Experimental Study on the Technology of Middle Empty Hole in Parallel Hole Cut Blasting

Article Preview

Abstract:

In order to reduce the adverse effect of the blasting vibration velocity to residents in the urban subway blasting excavation construction, and made it meet the requirements of design, based on the stress concentration effect of empty hole, carried out the research of middle empty hole in parallel hole cut blasting. Adopted the technology of middle empty hole in parallel hole cut blasting, by measuring the blasting vibration velocity, the utilization rate of borehole, the half eye tracking rate, and so on, the results showed that the blasting vibration velocity of cut blasting was 0.69cm/s, the blasting vibration of expansion slot blasting was 1.27cm/s, the borehole utilization was 90%, and the half eye tracking rate of periphery holes was 90%. The test results showed that this technology could effectively reduce the blasting vibration under the residential areas in blasting excavation, the effective experiences could be used in the similar projects.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 594-597)

Pages:

1314-1317

Citation:

Online since:

November 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] GIORGIO Berta. Blasting-induced Vibration in Tunnelling[J].Tunnelling and Underground Space Technology, Vol. 9 (1994) No 2,pp.175-187.

DOI: 10.1016/0886-7798(94)90029-9

Google Scholar

[2] S.Y. GUO. Progresses and Developments of Tunnel Construction Technology with Bored Blast Method[J]. Journal of Railway Engineering Society, 2007,No 9,pp.67-70.(In Chinese)

Google Scholar

[3] M.S. WANG. Tunnelling and Underground Engineering Technology in China (China Communications Press, China Beijng, 2010).(In Chinese)

Google Scholar

[4] X.B. LI, T.H. LING and Y.P. ZHANG. Analysis of Blast Vibration Signals-Theories and Methods (Science Press, China Beijing, 2009).(In Chinese)

Google Scholar

[5] S.Y. FENG and Z.Q. WANG. The Problems for Blasting Shock of Urban Metro[J]. China Railways, (2000) No 6,pp.32-34.(In Chinese)

Google Scholar

[6] Y.M. LI and Z.F. NI. The Characteristics on Surface Vibration of Blasting in Underground Engineering[J]. Chinese Journal of Rock Mechanics and Engineering, Vol. 16 (1997) No 3,pp.274-277.(In Chinese)

Google Scholar

[7] S.G. FU, Y.H. WANG and K.L. XU. Study on the Evaluation of Blast Vibration Effect and Measures of Reducing Vibration[J]. Journal of Safety Science and Technology, Vol.4 (2008) No 6,pp.25-28.(In Chinese)

Google Scholar

[8] X.G. WANG, Y.L. YU. On Several Problems of Safety Criterion for Blasting Vibration[J]. Engineering Blasting, Vol.2 (2001) No 7,p.88–92.(In Chinese)

Google Scholar

[9] Z.Y. WANG, X. LIANG and Y.L. CHEN. Study of Safety Evaluation Method of Blasting Vibration Based on Input Energy[J]. Chinese Journal of Rock Mechanics and Engineering,Vol.29 (2010) No 12,pp.2492-2497.(In Chinese)

Google Scholar

[10] J.H. ZHU. The Safety Evaluation of the Close Building under the Tunnel Blasting Vibration[J]. Chinese Journal of Explosives&Propellants, Vol.30 (2007) No 1,pp.78-80.(In Chinese)

Google Scholar

[11] Z.W. YUE, R.S. YANG and D.M. GUO. Model Experimental of Stress Field Around Empty Hole Under Blasting Loading[J]. Journal of China Coal Society, Vol.5 (2009) No 34,pp.624-628.(In Chinese)

Google Scholar