Construction Schedules Simulation and Prediction of Water Conveyance Tunnel Based on Karst Geological Condition

Article Preview

Abstract:

The construction process of water conveyance tunnel is complex and stochastic under the karst geological condition. Aiming at analyzing the construction process under this special condition, a simulation modeling method of water conveyance tunnel construction is presented. Through demonstrating the simulation analysis and predicting the schedules in a real case study of a water conveyance tunnel, this method is proved advanced and intuitive for formulating and analyzing the construction schedules under the karst geological condition.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 594-597)

Pages:

1298-1301

Citation:

Online since:

November 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] D.H. Halpin: Constr. Div. ASCE. Vol. 103(1977), p.489–499

Google Scholar

[2] K. J. Kim, Jr. Gibson, G Edward: Automation in Construction. Vol. 12(2003), pp.97-109

Google Scholar

[3] M. Lu, M. Anson, S. L. Tang, Y. C. Ying: Constr. Eng. Manage. Vol. 129(2003), p.547–554

Google Scholar

[4] H. J. Wang, J. P. Zhang, K. W. Chau, et al: Automation in Construction. Vol. 13(2004), pp.97-109

Google Scholar

[5] D. E. Lee: Journal of Construction Engineering and Management. ASCE. Vol. 3(2005), pp.310-318.

Google Scholar

[6] D. H. Zhong, D. H. Liu: Research on system simulation theory and application for construction processes of large-scale underground structure group (China Water Power Press, China 2003)(In Chinese)

Google Scholar

[7] D.K.H. Chua, Y. Song: Advances in Engineering Software. Vol.34(2003), p.671–681

Google Scholar