p.434
p.439
p.446
p.452
p.456
p.460
p.465
p.472
p.482
Study on Test Cycle of Build-up Well Test in Low Permeability Reservoir
Abstract:
The speed of development of well test technology has been faster than well test interpretation technology in low permeability reservoirs. One of the main research directions for well test soft technology was specific interpretation theory and interpretation techniques. In recent years, well test was put forward higher request by the production complex and low permeability reservoirs. Test interpretation results urgently need to be applied to reservoir engineering analysis in-depth and quantitatively. One of the limited reality conditions of well test application was lack of the comprehensive research combined with the reservoir engineering. Combining with the test examples, the investigation radius change between injection-production wells was studied, and the build-up well test cycle in low permeability reservoir was optimized. According to the actual process situation, it was proposed that take 20d as the upper limit of well test cycle, and 10d block as the lower limit of well test cycle of build-up well test in a typical low permeability reservoir.
Info:
Periodical:
Pages:
456-459
Citation:
Online since:
November 2012
Authors:
Price:
Сopyright:
© 2012 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: