Improvements in Manufacturing Processes in a Graphical Analysis as Result of Kaizen Events

Article Preview

Abstract:

Today every production worldwide has to improve their. Based on several concepts and philosophies such as Kaizen and others, it is possible to realize an increase of productivity. Since it is of great interest to know and to evaluate the improvement, a suitable method that allows not only analyzing the improvement of cost but also of time is of interest. Based on the value stream map (VSM) and the profile of cost and time (PCT) the author has developed the PECOTA method, a graphical method of analysis. The concept of investment in time and cost by PECOTA allows first-time analysis and evaluation of a change in a manufacturing process in an easy and fast way. The method includes also the possibility to define the limit of lean manufacturing with the current processes.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 605-607)

Pages:

352-357

Citation:

Online since:

December 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Shah, R., Lean manufacturing: context, practice bundles, and performance, Journal of Operations Management, 21(2), (2003).

Google Scholar

[2] Feld, W.M., Lean manufacturing: tools, techniques, and how to use them, APICS Series on Resource Management, Resource Management Series, The St. Lucie Press/APICS, EEUU, (2000).

DOI: 10.1201/9781420025538.ch2

Google Scholar

[3] Kaplinsky, R., The use of a lean manufacturing: index in explaining the transition to global competitiveness: the auto components sector in South Africa, Technovation, Vol. 24, (2004).

DOI: 10.1016/s0166-4972(03)00142-1

Google Scholar

[4] Ragu-Nathan, T.S., Level of End-User Computing Moderates the Impact of Time-Based Product Development Practices on Performance, International Journal of Product Development, Vol. 1, no. 3/4, (2005).

DOI: 10.1504/ijpd.2005.005943

Google Scholar

[5] Liker, J.K., Der Toyota Weg, Finanzbuchverlag, München, (2007).

Google Scholar

[6] Mika, G., Kaizen event implementation manual, Society of Manufacturing Engineers, USA, (2007).

Google Scholar

[7] Tommelein, I.D. (1998), Pull-driven Scheduling to Pipe-Spool Installation: simulation of a Lean Construction Technique, ASCE, Journal of Construction Engineering and Management, EEUU, (1998).

DOI: 10.1061/(asce)0733-9364(1998)124:4(279)

Google Scholar

[8] Rieger, B.T., M.A. Sebastian, Graphical Analysis of Improvements in Manufacturing Processes as Reaulst of Kaizen Events, Key Engineering Materials, Vol. 502 (2012) pp.63-68.

DOI: 10.4028/www.scientific.net/kem.502.63

Google Scholar

[9] Rivera, L., Inter-Enterprise Cost-Time Profiling, Virginia Polytechnic Institute and State University, Blacksburg, USA, (2006).

Google Scholar