The Research of the Stress Test Technology on Bridge Type Grab Ship Unloader

Article Preview

Abstract:

The safety performance of bridge type grab ship unloaders are the main factors in the normal operation of a bulk cargo wharf. This article made a research of the stress test technology on the use of safety assessment on the structure of the bridge type grab ship unloader, through the dynamic stress test of ship unloader key parts of the structure under the use of the condition, analysis bridge type grab ship unloader safety performance is at ordinary times and maintenance and inspection needs to focus on the dangerous site.Stress test shows that the Maximum compressive stress is Point 7, its maximum dynamic compressive stress is 82.5MPa; while the maximum tensile stress occurs at point 11, its maximum dynamic tensile stress of 72.5MPa. After 17 years used, The force main parts (except former trolleys) of the ship unloader are basically the same as its design value.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 631-632)

Pages:

1017-1021

Citation:

Online since:

January 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Regulation for Periodicity Inspection of Lifting Appliances (TSG Q7015-2008). In: People's Republic of China State Administration of Quality Supervision, Inspection and Quarantine; 2008, p.3.

Google Scholar

[2] YUN-FEI CHANG. Fatigue Life Evaluation of a Grab Ship Unloader[R]. China Steel Technical Report, No. 23, pp.36-41, (2010).

Google Scholar

[3] Yun-Fei Chang, Yih-Houng Chen. STRUCTURAL HEALTH ASSESSMENT OF THE OLDER SHIP UNLOADER[C]. 5th Civil Engineering Conference in the Asian, (2010).

Google Scholar

[4] LUO Hong-yun. Strength analysis in safety assessment of large harbour lifting equipment(in Chinese)[J]. Hoisting and Conveying Machinery. 2005. 03.

Google Scholar

[5] SHU Bin. The FEM Calculation and Analysis of the 160 t Gantry Crane's Portal Metal Structure on the Top of a Dam[D]; College of Logistics Engin. Wuhan Univ. of Tech. Wuhan 430063, China; (2007).

Google Scholar

[6] Jiang Wei, Xiao Su, Chen Fuqiang, Wang Jingzhou. Improved measures against dynamic displacement of bridge grab ship unloader in trolley running direction[J](in Chinese). Hoisting and Conveying Machinery. 2011. 03.

Google Scholar

[7] Zuo Wenqiao, Zhou Yuzhong. Statistical methods for steel structure stress spectrum of grab ship unloader[J](in Chinese). Hoisting and Conveying Machinery. 2011. 09.

Google Scholar

[8] HUANG Kai, ZHANG Yihui, ZHENG Jianrong. Analysis and evaluation of gantry crane safety performance under special dangerous working conditions[J](in Chinese). 《Computer Aided Engineering》 2011-02.

Google Scholar