Research on Port Construction Technique after Water Storage of the Three Gorges Project

Article Preview

Abstract:

With the Three Gorges reservoir built up, the water level rises sharply and the low construction water level in dry season does not exist. The relatively low water level is in draw-off period and building port faces long time of deep water level and precipitous fluctuation of water level in flood period. There are huge quantities under water. The construction period of low water level is short and the height of water level is up to 30 meters. Port construction is more difficult and complex at the Three Gorge reservoir region. This paper aims at these situations and puts forward the port constructing technique in deep water areas. It will provide guidance and reference in wharf construction.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

936-940

Citation:

Online since:

February 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Qiu Ju. Port Structures. Tian Jin . Tianjin university press. (2002).

Google Scholar

[2] Chen Wanjia . Marine structure . Beijing: People's traffic press, (1989).

Google Scholar

[3] Liu Jiahao. Port &waterway engineering construction technology[M]. Beijing: people's traffic press, (2004).

Google Scholar

[4] Wang Duoyin, Zhou Shiliang, LiuMingWei. The technology research of shipping construction in Permanent Backwater Region of Three Gorges Reservoir[R]. Chongqing: Chongqing Jiao tong university, The technology research center of Chongqing shipping engineering, (2008).

DOI: 10.3934/math.2021810

Google Scholar

[5] Wang Duoyin, Zhou Shiliang, Liu Mingwei. The basic principle discussions of port wharf construction of Three Gorges Reservoir [J]. Journal of Chongqing traffic institute, 2003, 23 (suppl): 107-111.

Google Scholar

[6] Zhang Zhong Ting. Bored piles design and construction [M]. China architecture building press, (2007).

Google Scholar

[7] Chen Dewwang., The second phase project of steel ramp bridge lifting construction technology of Caofeidian ore terminal [J]. Harbor construction of China, 2011, 2: 39-41.

Google Scholar