Strengthening and Retrofitting of the Industries Building After Fires

Article Preview

Abstract:

The reinforcement project is three-storey of the industries building, the total height of the industries building is 14,200mm, the clear height of one storey is 7,500mm, the building area is 1,500 square meters, structural mode is reinforced concrete frame structure. The structural members were damaged seriously due to fire In January 2010, strengthening the damaged members was proposed in order to ensure the safety of the structure. Enlarging section reinforcement method, Polymer Mortar and gluing CFRP methods were adopt to strengthen the beams, columns and floor slab depending on the damage degree of the concrete member.The idea of dealing with the industries building damaged by fire can provide us a good reference of repairing the similar industries building.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 671-674)

Pages:

778-781

Citation:

Online since:

March 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Zhang Youcai, The inspection, assessment, strengthening and reformation about building structure[M]. Beijing: Metallurgical Industry Press, Oct., 1997. (in Chinese).

Google Scholar

[2] GB50010-2010. Code for design of concrete structures[S]. (in Chinese).

Google Scholar

[3] GB50367-2006. Degin code for strengthening concrete structure[S]. (in Chinese).

Google Scholar

[4] Galal, K. Lateral force–displacement ductility relationship of nonductile squat RC columns rehabilitated using FRP confinement. Struct. Eng. Mech, 2007, 25(1): 75–90.

DOI: 10.12989/sem.2007.25.1.075

Google Scholar

[5] LI Jun-hua, TANG Yue-feng, LIU Ming-zhe, XIAO Han, ZHAO Yin-hai. Experimental Study on Rehabilitation of SRC Columns After Exposure to Fire[J]. ENGINEERING MECHANICS, 2012, 29(3): 177-183. (in Chinese).

Google Scholar