Key Techniques of Integral Lifting of Steel Tube Arch for Zhuzhou Bridge in Baise

Article Preview

Abstract:

Superstructure of Zhuzhou Bridge in Baise is a combined system with strong beam and weak arch. It is combined by concrete arches of continuous rigid frame-steel tube. The construction sequence is first the beam then arch, finally the temporary pier is demolished to form the combined system. The middle three parts of steel tube arch rib in the middle span were assembled to a large unity, and it was integrally lifted by synchronous system of hoisting jack to reach positive stop. The techniques have the characteristics of fast, safe and low cost.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 694-697)

Pages:

3040-3044

Citation:

Online since:

May 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Two stage working drawing for Zhuzhou bridge in Baise. Survey and Design Institute for Communications Planning for Guangxi.

Google Scholar

[2] Shuixing Zhou, Zhaoyi He, YisongZou. Calculation Handbook for road and bridge construction [M]. Beijing:People Transport Press, 2005.

Google Scholar

[3] Shaojin Huang,Mosheng Liu. Multi-Purpose instruction manual for prefabricated steel bridges[M]. Beijing:People Transport Press, 2002.

Google Scholar

[4] The Chinese Code for Design of Steel Structures (GB 50017-2003)

Google Scholar

[5] Road Bridge construction technical specifications (JTG/T F50-2011-2011)

Google Scholar