p.2443
p.2451
p.2457
p.2463
p.2469
p.2473
p.2479
p.2485
p.2491
Medical Cable Assembly Line Planning and its Optimization Based on Product Service System
Abstract:
The thesis adopts the SLP (System Layout Plan) to analyze the collected data of new PMS medical cable assembly product, manufacturing process and production material flow with the use of different tools, combined with constrained conditions related of the new facility to plan the process layout of the PMS medical cable assembly line, then adoptscorrelation analysismethods from production line balance theory and material flow project theory to improve layout of production line, so that the material transit distance could be shortened, the cost could be reduced and the balance rate of the production line could be improved. This thesis will be introduced by presenting the way of gathering solution for an example step by step.
Info:
Periodical:
Pages:
2469-2472
Citation:
Online since:
July 2013
Authors:
Price:
Сopyright:
© 2013 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: