The Risk Measurement of the Space Launch Test Project Based on Gray Relational Analysis

Article Preview

Abstract:

The special nature of space launch test projects requires ground personnel to reduce the occurring probability of risk and ensure the success of the projects to the greatest extents. Hence how to accurately identify, measure, control and manage risk through effective measurement is currently a focus of risk management for space launch test projects. This paper identifies risk factors in all the stages of the space launch test projects, and analyzes and sorts them based on the gray relational degree. The results offer advices for ground personnel to make more precisely identification and control of risk.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 718-720)

Pages:

686-691

Citation:

Online since:

July 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Cui Jijun, Space launch test project, Beijing: china astronautic press, 2010.

Google Scholar

[2] Luo Gang, Wen Lianghu, The Countermeasures for Risk of Space Launch Test in High-density Period, the Academy of Equipment Command&Technology journal, 2010.

Google Scholar

[3] Deng Julong, The gray system theory tutorial, Wuhan:Huazhong University of Science and Technology Press, 1990.

Google Scholar

[4] Liu sifeng, Guo tianbang, Dang yaoguo, The gray system theory and its applications, Beijing: the science press,1999.

Google Scholar

[5] Jun Fang, Ding Yuan, The Risk Evaluation of the Construction Project Design Based on the Gray Relational Grade, Management and Service science (MASS). 2010.

DOI: 10.1109/icmss.2010.5576884

Google Scholar

[6] Liu Wei, Wang Hong, The risk evaluation of construction project based on gray relational analysis, science, 2011.

Google Scholar

[7] Fu Zhimin, The aerospace project risk management, Beijing: Machinery Industry Press, 2005.

Google Scholar

[8] Bao Xueying, Tang Yongjun, A Gray Correlation Analysis Method to Select Construction Plans, Construction Management Modernization, 2006.

Google Scholar

[9] Wang Dongxia, Qi Zhongying, Grey System Theory in project risk management system, Technoeconomics & Management Research, No.4, 2006.

Google Scholar

[10] Chang CK, Lu HS. Design optimization of cutting parameters for side milling operations with multiple performance characteristics, Int J Adv Manuf Technol 2007;32:18–26.

DOI: 10.1007/s00170-005-0313-5

Google Scholar

[11] Yang YY, Shie JR, Huang CH. Optimization of dry machining parameters for high purity graphite in end-milling process, Mater Manuf Process 2006;21:832–7.

DOI: 10.1080/03602550600728141

Google Scholar