Feasibility Study on Lowering of Confined Water in a Foundation Pit Engineering

Article Preview

Abstract:

Under complicated engineering conditions involved with layered soil body and water stop measures, it is difficult to figure out accurate water head drawdown according to empirical formula. In this paper, numerical analysis method is applied to calculate water head drawdown in a foundation pit engineering after confined water is lowered, making settlement calculation possible. Acquisition of calculated settlement value provides reference for evaluating buildings safety state and the feasibility of dewatering scheme.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 726-731)

Pages:

3052-3055

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] QU Ji-li, LIU Guo-bin, ZHANG Jian-feng. Study on the settlement induced by pumping confined water in subway station on Dongchang Road in Shanghai[J]. China Civil Engineering Journal, 2002, 35(5):93-99. In Chinese.

Google Scholar

[2] LU Li-shun, LIU Jian-hang, LIU Qing-hua, LIU Song-qiao. Researches on soil settlement around deep excavation of a metro station in Shanghai[J]. Chinese Journal of Geotechnical Engineering, 2006,11(28):1764-1768. In Chinese.

Google Scholar

[3] XUE Yu-qin. Dynamics theory of below water[M]. Beijing: Geological Publishing Company, 1986. In Chinese.

Google Scholar

[4] LUO Guan-yong, PAN Hong,CHAO Hong, YIN Xiao-ling. Analysis of settlements caused by decompression of confined water[J]. Rock and Soil Mechanics,2004,11(25):196-200. In Chinese.

Google Scholar