Signal Acquisition and Process on Tower Crane Safety Control System
Abstract:
Tower crane collapse accidents occur frequently, personal injury or death became a common occurrence. According to the nationalGB12602-2011 lifting mechanical overload protection device security technical specifications, security and monitoring equipment must be installed on the tower crane. The GPRS and U disk storage tower crane control system has catered to the national security specified requirements, record and inquires can be realized, at the same time, the control system can achieve data wireless remote. Supervising person that in the units can monitor the construction site online. Meanwhile, the system can control the tower crane operations according to the specific situation of overrun.
Info:
Periodical:
Pages:
2141-2144
Citation:
Online since:
August 2013
Authors:
Keywords:
Price:
Сopyright:
© 2013 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: