p.3149
p.3153
p.3157
p.3162
p.3166
p.3169
p.3173
p.3177
p.3181
Reduce Cycle Time at Semiconductor Assembly Test Manufacturing with Factory Physics Methodology
Abstract:
Through a systematic and scientific manufacturing process approach of building awareness for the importance of cycle time improvement, providing the organization with knowledge on how to improve the manufacturing performance and then taking action on that knowledge. This paper will share how ATM made these incredible improvements in such a short time period by introducing factory physics concepts and rigorously applying them throughout the 9 months. Semiconductor Assembly Test Manufacturing (ATM) reduced cycle time by 35-70% in less than 1 year for semiconductor products. The results demonstrate the significant progress ATM has made in improving the effectiveness of the manufacturing by using Factory Physics (FP) concepts rather than relying on intuition.
Info:
Periodical:
Pages:
3166-3168
Citation:
Online since:
August 2013
Price:
Сopyright:
© 2013 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: