Numerical Analysis of a Pre-Stressed Bridge under Static Loads Based on ABAQUS

Article Preview

Abstract:

Finite element model of a pre-stressed bridge is established using finite element software Abaqus according to the characteristics of the bridge. Three static loads are respectively applied to the model to investigate the stress distribution. Numerical calculation results of stress and displacement show that the design of the bridge meets the requirements of static loading.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 756-759)

Pages:

194-197

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] X.F. Shi, Y. Xuan and L. Wang: Time-Dependent Emulation Analysis on Pre-stressed Curved Continuous Concrete Bridges during Construction and Open to Traffic. China Railway Science, Vol. 28 (2007) No. 4 p.61 (In Chinese).

Google Scholar

[2] B. Zhou and Y.M. Jia: ANSYS Modeling of Reinforced Concrete Continuous Bridge. Technology of Low Temperature Construction, Vol. 132 (2009) No. 6, p.70 (In Chinese).

Google Scholar

[3] J.L. Liu, T.Q. Yu and T.L. Wang: The Test and FEM Analysis for a Pre-stressed Box-girder of Light Railway in Wuhan. Journal of Polytechnic University, Vol. 18 (2003) No. 3 p.8 (In Chinese).

Google Scholar

[4] X.P. Li and H. Ren: Simulation Analysis of the Pre-stressing Effect on the Curved Box Girder Bridge. Journal of South China University of Technology (Natural Science Edition), Vol. 32 (2004) No. 12 p.47 (In Chinese).

Google Scholar

[5] B. Du and X.Z. Nie: Simulation of pre-stressed bridge transformed from simple-supported system into continuous system. Engineering Journal of Wuhan University, Vol. 37 (2004) No. 3 p.73 (In Chinese).

Google Scholar

[6] J. Chen, X.D. Shen and B. Sun: Three-dimensional Simulation Analysis of Pre-stressed Concrete Curved Beam Bridges During Construction. Journal of Highway and Transportation Research and Development, Vol. 24 (2007) No. 4 p.108 (In Chinese).

Google Scholar