[1]
H. Liu, Z. Jiang, and R. Y. K. Fung, Performance modeling, real-time dispatching and simulation of wafer fabricationsystems using timed extended object-oriented Petri nets , Computers & Industrial Engineering, Vol. 56, 121-137, (2009).
DOI: 10.1016/j.cie.2008.04.006
Google Scholar
[2]
T. C. Chiang, Y. S. Shen, and L. C. Fu, Adaptive lot/equipment matching strategy and GA based approach optimized dispatching and scheduling in a wafer probe center, in Proc 2004 IEEE International Conference on Robotics and Automation, New Orieans, LA. pp.3125-3130, April, (2004).
DOI: 10.1109/robot.2004.1307543
Google Scholar
[3]
D. Y. Sha, J. T. Lin, and C. J. Yang, The evaluation of search range assignment in 300 mm automated material handling system (AMHS), Int. J. of Advanced Manufacturing Technology, vol. 35, pp.697-710, (2008).
DOI: 10.1007/s00170-006-0747-4
Google Scholar
[4]
D. Y. Liao and C. N. Wang, Differentiated preemptive dispatching for automatic materials handling services in 300 mm semiconductor foundry, Int. J. of Advanced Manufacturing Technology, vol. 29, pp.890-896, (2006).
DOI: 10.1007/s00170-005-2610-4
Google Scholar
[5]
A. Gunasekaran, Implementation of computer-integrated manufacturing: a survey of integration and adaptability issues, Int. J. of Computer Integrated Manufacturing, vol. 10, no. 1-4, pp.266-280, (1997).
DOI: 10.1080/095119297131363
Google Scholar
[6]
G. S. Jong and J. S. Sug, Evolutionary simulation-based-design (ESBD) methodology for large computer integrated manufacturing systems, Int. J. of Computer Integrated Manufacturing, Vol. 14, No. 4, pp.385-398, (2001).
DOI: 10.1080/09511920010020758
Google Scholar
[7]
U. M. S. Filho, D. R. Vieira, and J. E. Pecore Jr., Simulation of the handling of pre-painted coils in a Brazilian steel instudry, presented at the 8th International Conference on Logistics and SCM Research, (2010).
Google Scholar
[8]
D. Kibira and C. McLean, Virtual reality simulation of a mechanical assembly production line, in Proceedings of the 2002 Winter Simulation Conference. pp.1130-1137, Dec., (2002).
DOI: 10.1109/wsc.2002.1166368
Google Scholar
[9]
J. H. Marvel and C. R. Standridge, A simulation-enhances lean process, J. of Industrial Engineering and Management, Vol. 2, no. 1, pp.90-113, (2009).
Google Scholar
[10]
R. Driessei and L. Monch, Simulation framework for complex manufacturing systems with automated material handling, in Proceedings of the 2007 Winter Simulation Conference. pp.1713-1721, Dec., (2007).
DOI: 10.1109/wsc.2007.4419794
Google Scholar
[11]
H. Gebauer and T. Fischer, Exploring service needs in the Chinese manufacturing industry, Chinese Management Study, vol. 3, no. 2, pp.143-154, (2009).
DOI: 10.1108/17506140910963657
Google Scholar
[12]
A. Gunasekaran, H. B. Marri, and B. Lee, Design and implementation of computer integrated manufacturing in small and medium-sized enterprise: a case study, Int. J. of Advanced Manufacturing Technology, vol. 16, pp.46-54, (2000).
DOI: 10.1007/pl00013131
Google Scholar
[13]
Y. Zhou and K. B. Chuan, Computer-integrated manufacturing in China, a report of industrial field survey, Int. J. of Operations & Production Management, vol. 22, no. 3, pp.271-288, (2002).
DOI: 10.1108/01443570210417588
Google Scholar