Experimental Study on the River Engineering Model of Tunnel across Yangtze River about Line No.8 of Track Traffic in Wuhan

Article Preview

Abstract:

Tunnel project across Yangtze River about Line NO. 8 of track traffic located at 450m in upper the second bridge of Wuhan reach. Change of velocity, hydrodynamic axis, diversion ratio of inlet about river reach of project under the different conditions of hydrology were studied through experiment of river engineering model, and the minimal buried depth of the top of tunnel about deep trough is about 7.5 m while the maximal scour depth of section about site of tunnel based on variation of deposition or erosion of riverbed, the possible lowest altitude of eroding, change of swing range of thalweg about river reach of tunnel project, and building of tunnel has no effect on river regime, flood control and shipping for river reach of project. The results can be applicable as a reference for design of project.Key words: tunnel across river; river engineering model; river regime; flood control; altitude of deepest location

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 779-780)

Pages:

572-577

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Zhang Hui, Qu Li-hua, QuQeng. Experimental study on the river engineering model of tunnel across Yangtze river about line No. 8 of track traffic in Wuhan. Yangtze River Scientific Research Institute,(2011).

DOI: 10.4028/www.scientific.net/amr.779-780.572

Google Scholar

[2] Professional Board of Sediment, Chinese Hydraulic Engineering Society. Sediment notebook, Beijing: Chinese Environment Science Press, (1992).

Google Scholar

[3] Ling Qian, Zaohui Wan. Movement Mechanics of Sediment, Beijing: Chinese Environment Science Press, (1983).

Google Scholar