Tunnel Waterproofing Board Construction Process Analysis
Abstract:
This article from preparation befor the job, blind pipe with fixed and waterproof plate laying geotextile, analysis of waterproof board laid before the preparatory work, waterproof board laid process related indicators of control, and offer reference for the construction of the tunnel.