p.103
p.117
p.124
p.135
p.159
p.163
p.174
p.186
p.194
Calandria - A Manufacturing Challenge
Abstract:
Accelerating the pace of Nuclear Power Plants construction is critical to the Growth of Indian Economy. It calls for timely and First Time Right manufacturing of various Reactor Equipment. This paper captures the experience of Godrej Precision Engineering Division in successful realization of Calandria, in record time, with First Time Right Quality adhering to very demanding and stringent requirements.
Info:
Periodical:
Pages:
159-162
Citation:
Online since:
September 2013
Authors:
Keywords:
Price:
Сopyright:
© 2013 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: