Examination and Repair on the Tube-Tube Sheet Welding Deviation of Steam Generator

Article Preview

Abstract:

Tube-Tube sheet welding area of Steam Generator is one of the most fallibility positions in the first loop of Nuclear Power Plant. To make sure the Secondary side hydro-test of on site of Steam Generator is successful at the first round, the relative parties organize to check the 8948 Tube-Tube sheet sealing welding area before the test. Through the introduction of the Checking progress, for example, Defect confirming, Defect location, Defect dealing, Defect repair and other progress, the basic reason of deviation has been analyzed. And also, some discussions and concerns were given which will very useful as an experience feedback.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

404-408

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] ZHANG Xuerong, Huo Li, etc. Nuclear Power Station Steam Generator and Its Quality Supervision[J]. Electric Power Construction, 2007, 28(8): 53-55.

Google Scholar

[2] GU Yongkang, Zhang Liangcheng, etc. Welding for tube to tube-plate of 600MW nuclear power evaporator[J]. Welding and Joining, 2011, (2): 33-35.

Google Scholar

[3] GUO Depeng, ZHU Kun, etc. Analysis and Quality Control on Tube-Tube sheet Joint Expanding Technique[J]. Chemical Engineering & Machinery, 2012, 39(6): 695-699.

Google Scholar

[4] MA Xinchao. Welding Procedure Qualification Transference to Different Project of Nuclear Power Item during the Construction Period[J]. Electric Welding Machine, 2011, 41(6): 13-17.

Google Scholar

[5] SHENG Xuting. PWR Steam Generator Manufacture Activity Overview[J]. Shanghai Machine Tool, 2010, (4): 36-42.

Google Scholar

[6] LIANG Yu, YANG Yun, ZOU Jie. Tube to Tube Plate Welding of MSR Tubesheet[J]. Pressure Vessel Technology, 2009, 26(9): 59-63.

Google Scholar