Abstract:

This paper is based on one project of Metro shield tunnel across a high-speed railway bridge. In the study the impact of train operations is taken into account, the finite-element method is adopted to analyze effect of shield tunneling. The conclusions indicate that according to the different tunnels and relative positions of pile, the excavation of the tunnels would have different effects on pile foundation. When the construction of shield across the bridge, the nature of the soil and will have an effect on deformation and stress of pile. Due to tunnel excavation of bridge internal force on bridge attached to the forces of good roles and bad role. Additional deformation of the beams and the additional forces are very small, so they will not affect the bridge work.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

423-429

Citation:

Online since:

December 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Zhansheng Wang, Mengshu Wang. Effects of Shield-Driven Tunneling on the Safety of Adjacent Buildings and Its Countermeasures. [J]. China Safety Science Journal, 2002, 12 (2): 45-49.

Google Scholar

[2] Yongsheng Li, Haiying Huang. Computation of Mechanical Effect on Adjacent Pile by Shield Excavation [J]. Journal of Tongji University, 1997, 25 (3): 274-277.

Google Scholar

[3] Jizhu Sun. Engineering Analysis Method for Shield Moving Influence on Pile Foundation[J]. Journal of Wuhan University of Technology, 2003, 25 (3): 56-58.

Google Scholar

[4] Bingjun Wang, Li Ning, Houxiang Liu. Effects of shield tunneling on adjacent existing loaded pile foundations[J]. Journal of Railway Science and Engineering, 2006, 3 (3): 35-40.

Google Scholar

[5] Chao Yang, Maosong Huang, Mingyun Liu. Three-Dimensional Numerical Analysis of Effect of Yunnel Construction on Adjacent Pile Foundation[J]. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(Supp. 1): 2601-2607.

Google Scholar

[6] Ning Yu, Hehua zhu. The Simulation of Shield TunnelConstruction and Analysis of it's Influenceupon Surrounding Environments. [J]. Rock and Soil Mechanics, 2004, 25 (2): 293-296.

Google Scholar

[7] Fengbin Zhu, Ping Yang, ONG C W. Numerical Analysis ON Influence of Shield Tunnel Excavation to Neighboring Piles[J]. Chinede Journal of Geotechnical Engineering, 2008, 30 (2): 299-302.

Google Scholar

[8] LOGANATHAN N, POULOS H G, STEWART D P. Centrifuge Model Testing of Tunnelling-Induced Ground and Pile Deformations[J]. Geotechnique, 2000, 50 (3): 283-294.

DOI: 10.1680/geot.2000.50.3.283

Google Scholar

[9] JACOBSZ S W, STANDING J R, MAIR R J, et a1 Centrifuge Modelling of Tunneling Near Driven Piles [C] Proceeding of the 3rd International Organizations Symposium: on Geotechnical Aspect of Underground Construction in Soft Ground. France: Toulouse. 2002: 89-94.

Google Scholar