Numerical Analysis of Deeply Buried Small Net Distance Tunnels on Rock Stability under Different Construction and Methods

Article Preview

Abstract:

Based on the background of a highway, for tunnels with small spacing of complex stress condition, adopt various construction schemes for numerical simulation using Midas Gts finite element software under the condition of deep-buried small net distance tunnel. Use full-face excavation method, benching tunneling construction method and both side heading method to compare surrounding rock stress, surrounding rock deformation, internal force of bolt and shotcrete support system structure, lateral-wall displacement and stability of surrounding rock. Analyse displacement and stress change laws before and after the excavation of tunnel surrounding rock and supporting structure under different schemes.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 838-841)

Pages:

1346-1351

Citation:

Online since:

November 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] People's Republic of China Ministry of transportation. JTG D70-2004. Code for design of highway tunnel [S]. Beijing: the people's transport Publishing House, (2004).

Google Scholar

[2] Yue Xiaolei, Li Xiaojing, Zhang Yan, Zhu Dongmei. Different construction methods of shallow tunnels with small clear spacing study on numerical simulation of surrounding rock stability of [J]. railway constructions. 2012 (5): 51-53.

Google Scholar

[3] Peng Qi, Lowe. Shallow buried side pressure of small interval tunnel construction mechanics numerical analysis [j]. Railway construction. 2009: 34-37.

Google Scholar

[4] Hao Wenzhou. Bias rational discussion on construction process of tunnels with small clear spacing [J]. Railway constructions. 2011: 26-28.

Google Scholar

[5] Liu Zhenggang. Shallow buried side pressure numerical simulation of construction process of tunnels with small clear spacing highway project [J]. 2011, 36 (2): 120-123.

Google Scholar

[6] Peng Qi, Luo Wei, Li Liang. Construction of shallow buried and unsymmetrical pressure tunnel with small clear spacing numerical [J]. 2009, 34 (4): 34-37.

Google Scholar

[7] Wang Jihuai. Small-distance tunnel excavation numerical simulation and study on dynamic characteristics of [d]. Changsha University, (2012).

Google Scholar

[8] Xu Shusheng, Zeng Xiangguo, Yao Anlin. Excavation process on the stability of surrounding rock of tunnels with small clear spacing [J]. Sichuan Building Science 2009, 35 (3): 91-95.

Google Scholar

[9] Li l. Three-step method with CRD method on stability of tunnel surrounding rock [j]. the highway engineering. 2012, 37 (6): 138-142.

Google Scholar

[10] Ding Rui, Fan Peng, Jiao Cang. Different excavating procedures numerical analysis of ground surface settlement caused by shallow tunnel [J] Journal of railway engineering (2005): 62-65.

Google Scholar